Tallgrass Energy and Wyoming-based Bridger Pipeline launched a 30-day open season on Jan. 24 for a section of the Pony Express Pipeline.
Kansas-based Tallgrass announced a binding, joint-tariff open season for shipper commitments of crude oil to be moved between Bridger Pipeline’s Guernsey Hub in southeast Wyoming and the Pony Express’ Guernsey and Sterling origin terminals. The Sterling terminal is in Northeast Colorado.
This is the fourth open season, each for different sections of the pipeline, that Tallgrass has announced since March 2023.
Prospective shippers can review details of the open season after contacting and signing a confidentiality agreement with Tallgrass.
The Pony Express Pipeline is an 830-mile, 230,000 bbl/d network with a main line from Guernsey to Cushing, Oklahoma, with a secondary Northeast Colorado Lateral that delivers up to 90,000 bbl/d to Cushing.
Recommended Reading
CNOOC Makes 100 MMton Oilfield Discovery in Bohai Sea
2024-03-18 - CNOOC said the Qinhuangdao 27-3 oilfield has been tested to produce approximately 742 bbl/d of oil from a single well.
TPH: Lower 48 to Shed Rigs Through 3Q Before Gas Plays Rebound
2024-03-13 - TPH&Co. analysis shows the Permian Basin will lose rigs near term, but as activity in gassy plays ticks up later this year, the Permian may be headed towards muted activity into 2025.
Proven Volumes at Aramco’s Jafurah Field Jump on New Booking Approach
2024-02-27 - Aramco’s addition of 15 Tcf of gas and 2 Bbbl of condensate brings Jafurah’s proven reserves up to 229 Tcf of gas and 75 Bbbl of condensate.
Well Logging Could Get a Makeover
2024-02-27 - Aramco’s KASHF robot, expected to deploy in 2025, will be able to operate in both vertical and horizontal segments of wellbores.
Shell Brings Deepwater Rydberg Subsea Tieback Onstream
2024-02-23 - The two-well Gulf of Mexico development will send 16,000 boe/d at peak rates to the Appomattox production semisubmersible.