The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Anschutz Exploration Corp. has retained EnergyNet for the sale of six AFE asset packages in Campbell County, Wyoming. The package includes 80 offset permits and 331 active offset operators.
Opportunity highlights:
Projected formation: Niobara
- Operator: EOG Resources, Inc.
- 80 Offset Permits
- New Drill: 18 Completed | 15 Confidential | 12 DUC/Drilled | 29 Permitted
- Amended: 3 Completed
- Re-Enter: 1 Drilled | 2 Permitted
- 331 Active Offset Producers
Select Offset Operators: Ballard Petroleum Holdings LLC; EOG Resources, Inc.; Peak Powder River Resources LLC
Projected formation: Parkman
- Operator: EOG Resources, Inc.
- 80 Offset Permits
- New Drill: 18 Completed | 15 Confidential | 12 DUC/Drilled | 29 Permitted
- Amended: 3 Completed
- Re-Enter: 1 Drilled | 2 Permitted
- 331 Active Offset Producers
Select Offset Operators: Ballard Petroleum Holdings LLC; EOG Resources, Inc.; Peak Powder River Resources LLC
All bids are due March 1 at 4 p.m. CST. For complete due diligence, please visit energynet.com, or email Reilly Bliton, director, at Reilly.Bliton@energynet.com.
Recommended Reading
Exxon’s Guyana Gas Project a “Win-Win,” Set for Hook-up by Year-end ‘24
2024-04-26 - Exxon Mobil Corp. CEO Darren Woods said the company’s gas-to-power project in Guyana is a “win-win proposition particularly for the people of Guyana” when completed and hooked-up by year-end 2024.
Gunvor Group Inks Purchase Agreement with Texas LNG Brownsville
2024-03-19 - The agreement with Texas LNG Brownsville calls for a 20-year free on-board sale and purchase agreement of 0.5 million tonnes per annum of LNG for a Gunvor Group subsidiary.
Babcock & Wilcox to Convert Coal Plant to NatGas
2024-03-18 - B&W will convert the plant’s two coal-fired boilers to natural gas by designing and installing burners, air systems, fans and other equipment.
NextDecade Targets Second Half of 2024 for Phase 2 FID at Rio Grande LNG
2024-03-13 - NextDecade updated its progress on Phase 1 of the Rio Grande LNG facility and said it is targeting a final investment decision on two additional trains in the second half of 2024.
Sempra Targets Summer 2025 for Commercial Start of ECA LNG Phase 1
2024-03-06 - Sempra is targeting the summer of 2025 as the commercial operations date for its 3.25 mtpa (0.43 Bcf/d) nameplate capacity Energía Costa Azul LNG Phase 1 project, located in Ensenada in Baja California, Mexico.