Petrochem Operating Completes First Well In Red River Parish, La.

Drilling Activity Details

Locations

LA
United States

Post Date
Shore Type
Well Name
#1 Hanna 33
Geo Coordinate

Drilling Activity Summary

Description

In Redoak Lake Field, Petrochem Operating Co. completed its first well in Red River Parish, La. The upper Glen Rose discovery, #1 Hanna 33, was tested flowing 1.018 MMcf of gas, with no liquids. Production is from perforations at 3,618-22 ft, and it was tested on 12/64-in. choke with a flowing casing pressure of 800 psi. The vertical well was drilled to 3,823 ft in Section 33-12n-9w. Petrochem’s headquarters are in Shreveport, La.