Learn more about Hart Energy Conferences
Get our latest conference schedules, updates and insights straight to your inbox.
PITTSBURGH—Projects like Cove Point LNG have been on the horizon for so long that Don Raikes’ simple declaration at the recent Marcellus-Utica Midstream Conference drew a few gasps.
“Our projected in-service date is early March 2018, very soon,” said Raikes, senior vice president for Dominion Midstream Operations’ gas infrastructure group. “We made our first LNG two days ago.”
The conversion of Dominion’s (NYSE: D) 1,000-acre facility from import facility to major bi-directional terminal was not just going to happen but was happening.
“Cove Point is a game-changer, both in terms of Northeast market and world LNG,” Raikes said.
At least part of the reason is that its Maryland home on the Eastern Seaboard positions Cove Point near the mighty Marcellus Shale. It’s a point that is not lost on potential customers.
“When I toured the world selling Cove Point capacity with my team, the one word that you didn’t need an interpreter for—wherever you were—is Marcellus,” Raikes said. Subscribers include representatives from LNG-thirsty countries such as ST Cove Point, a joint-venture of Sumitomo Corp. and Tokyo Gas Co. Ltd.; and the U.S. affiliate of GAIL (India) Ltd.
While access to natural gas from the Marcellus and Utica is a key selling point, along with the Cove Point’s stature as only the second U.S. LNG export facility to begin operation (after Cheniere Energy Inc.’s Sabine Pass, La.) and first on the East Coast, Raikes also emphasized the tolling business model.
“Our model allows our customers the flexibility to go out and acquire the supplies that they want, negotiate the terms on the supplies that they want, get the transportation,” he said. “They deliver to our plant, we convert it into LNG and put it in their ship.”
Advantages of this system include:
- The customer controls its own destiny with supply;
- Not only is there no supply risk for Cove Point, but the deal is take-or-pay; and
- Customers have no restrictions on commercial destinations: “They are free on the market within the regulations that they have,” Raikes said.
“The minute they sign these U.S. contracts, [our customers] have significant benefits in the renegotiation of the contracts they already have,” he said. “This gave them newfound flexibility even before the plant came online.”
Flexibility also extends to the size of the tanker. Cove Point has two berths that are able to handle Q-Max, or Qatar-Max tankers, the largest LNG carriers in the world.
Maritime Connector website describes the typical Q-Max as 1,132 feet long, 177 feet wide and 114 feet in height. The ships can carry up to 162 million cubic meters of natural gas, or enough to power 70,000 U.S. homes for a year. Onboard is a re-liquefaction unit to limit LNG losses during the voyage and keep toxins from leaking into the sea.
Sabine Pass can handle Q-Max vessels as well, but neither the Q-Max nor the smaller Q-Flex tankers can traverse the Panama Canal.
Cove Point was built in the 1970s as an import terminal and became dormant after just a few years. Dominion bought it in the early 2000s and began importing gas. In 2011, the company filed an export application, then began the paperwork process with the Federal Energy Regulatory Commission (FERC) in 2012. Final applications were submitted in 2013, followed by FERC approval and start of construction in 2014.
Only 130 of the 1,000 acres are occupied by the plant. The rest are devoted to conservation and Raikes appeared proud to mention the awards Dominion has received for its environmental stewardship.
He is also proud of the role Cove Point will play in the emerging U.S. LNG export sector. This year, 10% of the country’s natural gas production will be exported; by 2022, that share will be 18%.
“When you look at the world demand,” he said, “there is a significant amount of growth opportunity for LNG.”
Joseph Markman can be reached at jmarkman@hartenergy.com and @JHMarkman.
Recommended Reading
ONGC’s M Field Starts Production in Bay of Bengal
2024-01-09 - ONGC’s M Field represents the second phase of the larger 98/2 Block development project which is expected to reach peak production of 45,000 bbl/d and 10 MMcm/d.
Beach Town Corpus Christi Grows into America’s Top Energy Port
2024-01-16 - The Port of Corpus Christi is the U.S.’ largest energy export gateway and in terms of total revenue tonnage as increased midstream investments have opened export markets for the prolific Permian Basin.
Trio Petroleum to Restart McCool Ranch Oilfield
2024-01-07 - California’s Trio Petroleum plans to restart oilfield production at McCool Ranch, where six wells that previously reached a production peak of 400 bbl/d.
Range Resources Expecting Production Increase in 4Q Production Results
2024-02-08 - Range Resources reports settlement gains from 2020 North Louisiana asset sale.
To Dawson: EOG, SM Energy, More Aim to Push Midland Heat Map North
2024-02-22 - SM Energy joined Birch Operations, EOG Resources and Callon Petroleum in applying the newest D&C intel to areas north of Midland and Martin counties.