Jones Completes Two Anadarko Basin Wells From Drillpad
Drilling Activity Details
OK
United States
Drilling Activity Summary
Description
Results from two Anadarko Basin horizontal producers were announced by Jones Energy Inc. from a common pad in Section 20-12n-7w, Canadian County, Okla. The #2H Bomhoff 20-12-7 had a peak flow rate of 650 bbl of oil and 6.31 MMcf of gas per day from a treated Upper Meramec lateral that was drilled to the north to 14,898, 10,441 ft true vertical. Twenty ft west on the pad, #1H Bomhoff 20-12-7 was tested flowing 278 bbl of oil and 3.57 MMcf of gas per day from a parallel Woodford lateral. It was drilled to 14,936 ft and the projected true vertical depth was 10,419 ft. Additional details are not currently available regarding either well from the Austin-based operator.
Results from two Anadarko Basin horizontal producers were announced by Jones Energy Inc. from a common pad in Section 20-12n-7w, Canadian County, Okla. The #2H Bomhoff 20-12-7 had a peak flow rate of 650 bbl of oil and 6.31 MMcf of gas per day from a treated Upper Meramec lateral that was drilled to the north to 14,898, 10,441 ft true vertical. Twenty ft west on the pad, #1H Bomhoff 20-12-7 was tested flowing 278 bbl of oil and 3.57 MMcf of gas per day from a parallel Woodford lateral. It was drilled to 14,936 ft and the projected true vertical depth was 10,419 ft. Additional details are not currently available regarding either well from the Austin-based operator.