The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Point Energy Partners Operating LLC retained EnergyNet for the sale of an overriding royalty interest in a 24-well package plus seven DUCs located in Ward County, Texas. The Lot# 103955 package includes the 24 active wells with current net production of 1.1 MMboe/d (81% liquids) across the Wolfcamp and Bone Spring formations of the Permian Basin.
Opportunity highlights:
- 24 active wells producing from five stacked unconventional reservoirs across the Wolfcamp and Bone Spring formations
- 1.1 Mboed current net production, 81% liquids
- All completed 2020 and later with decades of production remaining
- 7 DUCs scheduled for completion and TIL in first half (1H) of 2023
- 12,400 ft. average lateral length
- 4,000+ lbs/ft. high-intensity completion design has demonstrated production outperformance compared to offset wells
- Average RI: 9.5%
- NTM cash flow $25.3MM supported by meaningful existing production base
- Favorable RI attributes
- PEP retains average WI of 99% among the wells and full economic alignment with RI
- Experienced Delaware pure-play operator with a track record of strong operational performance and currently running a two-rig program
- Newly installed state-of-the-art production facilities reduce carbon footprint and maximize profitability with minimal downtime
- Advantageous long-term marketing arrangements for stable margins and cash flow
Bids are due at 4:00 p.m. CDT on Feb. 9. Bids are due at 4:00 p.m. CDT on Feb. 8. For complete due diligence information, please visit energynet.com or email Zachary Muroff, managing director, at Zachary.Muroff@energynet.com or Reilly Bilton, director of engineering at EnergyNet Indigo, at Reilly.Bilton@energynet.com.
Recommended Reading
Tallgrass Declares Open Season for CO2 Transport Pipeline
2024-05-06 - Tallgrass Energy’s Trailblazer project, originally a natural gas pipeline, would move greenhouse gas from Nebraska and Colorado and store it in geological formations in Wyoming.
Targa Expects Another Major Permian Pipeline Project This Year
2024-05-03 - Targa Resources says different projects are falling in place for gas capacity expansion
US Appeals Court Upholds FERC Approvals for Gas Pipeline Expansion
2024-05-02 - A unanimous three-judge panel of the U.S. Circuit Court of Appeals for the D.C. Circuit held that the Federal Energy Regulatory Commission was right to determine the Evangeline Pass Expansion project is functionally separate from four related gas infrastructure developments.
Enterprise Targets FID for SPOT Project by End of 2024
2024-05-01 - Enterprise Products Partners’ co-CEO disputed capex figures reported in the media regarding its Sea Port Oil Export Terminal.