Canyon Lime Completion By Le Norman In Amarillo North Field

Drilling Activity Details

Locations

TX
United States

Plays
Post Date
Shore Type
Well Name
#1H Bivins 37-36 East
Geo Coordinate

Drilling Activity Summary

Description

Le Norman Operating LLC reported a Canyon Lime discovery in Potter Country (RRC Dist. 10), Texas. Located in Section 51, Block 1, BS&F Survey, A-111, #1H Bivins 37-36 East flowed 778 bbl of oil, 298 Mcf of gas and 1.498 Mbbl of water per day. The development well is in Amarillo North Field and was drilled to the south across Section 37 and bottomed in Section 36, A-136. The total depth is 14,550 ft and the true vertical depth is 6,796 ft and was tested on a 64/64-in. choke with a flowing tubing pressure of 125 psi. Le Norman’s headquarters are in Oklahoma City.