Devon Reports Results From Two Offsetting Leonard Shale Wells

Drilling Activity Details

Locations

NM
United States

Operators
Plays
Post Date
Well Name
#124H Thistle Unit, #109H Thistle Unit
Geo Coordinate

Drilling Activity Summary

Description

Two offsetting Leonard Shale wells in the Delaware Basin were completed by Devon Energy Corp. According to IHS Markit, the Thistle spacing pilot in Lea County, N.M., tested 400-ft vertical spacing between the Leonard B and C intervals. The Triple X Field-Thistle wells were drilled with 7,000-ft laterals. The #124H Thistle Unit flowed 127 bbl of oil, 214 Mcf of gas and 1.906 Mbbl of water per day from acid- and fracture-stimulated perforations at 9,962-16,995 ft. The 17,057-ft venture is in Section 22-23s-33e and the true vertical depth is 9,777 ft. The lateral bottomed about 1.5 mile to the south in Section 27. The deeper Leonard C well, #109H Thistle Unit, runs parallel #124H Thistle Unit. The #109H Thistle Unit was shut-in after being drilled in late 2015 to is 17,602 ft, 10,101 ft true vertical and no other details were reported.