The industry generally recognizes the definition of an intelligent completion, as described at the 2001 Society of Petroleum Engineers forum in St. Maxime, France, as one in which control of inflow (or injection) takes place downhole at the reservoir, with no physical intervention, with or without active monitoring.
To realize this, the following elements