Text Size:
A | A

Gulf Coast

Text Size: A | A
 
June 1, 2011

1. A horizontal Eagle Ford well was completed as part of Gates Ranch Field by Rosetta Resources Operating LP in Webb County (RRC Dist. 4), Texas. The #101 Rose B. Gates 09 was tested flowing 6.39 million cu. ft. of gas, 15 bbl. of 62.7-degree condensate and 19 bbl. of water per day through fracture-treated perforations at 8,866-13,827 ft. On a 20/64-in. choke, flowing tubing pressure was 3,972 psi and the shut-in casing pressure was 4,040 psi. Located on a 6,597-acre lease in Section 2182, Joaquin Galan Survey, A-65, the ...


Already a subscriber? Log In
Password:
 
Does your company have a site license? Inquire here
Already a print subscriber? Upgrade your magazine subscription