Kallisto Energy announced that wells three and four of the planned water-flood scheme at Pembina, Alberta have been drilled, completed and placed on production. The horizontal wells, located at 102/04-04-048-03 W5M and 100/05-04-048-03 W5M, were completed using multi-stage fracture stimulations. The drilling of the first two wells of the water-flood scheme was announced on August 13, 2012. Production from the four new horizontal wells is in line with historical performance from previous wells. Kallisto now has an interest in twelve producing Cardium oil wells at Pembina.
The water-flood scheme is ...