Trio Petroleum Corp. provided operational updates on its Presidents and McCool Ranch fields in Monterey County, California, according to an April 11 press release.
On March 26, Trio brought the HV-3A well in the Presidents Field, a part of the South Salinas Project, back into full-time production.
The company said oil production on the well averages 30 bbl/d and is producing from 125 ft of perforations in the Yellow Zone and upper Monterey Clay each.
Trio believes that production at HV-3A can increase through low-cost investments such as perforating up to 650 ft in the currently producing oil zones and opening already perforated deeper behind-pipe oil zones, acidizing the well for borehole cleanup.
The company’s geological team estimates that there are up to 50 additional developmental well locations in Presidents Field at 40-acre well spacing.
At McCool Ranch, Trio is operating the HH-1 well, which is producing approximately 45 bbl/d of oil. Based on the well’s production results, the company plans to add more shut-in oil wells in the field.
The 35X well, located in McCool Ranch, returned to production this month, while the 58X well is in the final stages of being brought back online after receiving a heat treatment, Trio said.
“Bringing these wells back online and taking the necessary steps to permit permanent production sets the stage for an expanded drilling program in these fields,” said Trio CEO Michael Peterson. “We correctly identified these assets from a geological perspective, we drilled successful multiple test wells. Now we want to take the logical next steps in extracting value from these assets.”
The HH-1 well and the HV-3A well collectively produce about 75 bbl/d and volumes are expected to increase as the 35X and 58X wells resume full time.
Recommended Reading
Exclusive: Adkins on Challenged Gas Prices, Growing Crude Demand
2024-05-15 - J. Marshall Adkins, head of energy investment banking at Raymond James, details the future of natural gas prices and misconceptions about crude demand coming to an end in this Hart Energy Exclusive interview.
CoolCo, GAIL Enter Long-term LNG Agreement
2024-05-16 - CoolCo and GAIL’s agreement is intended to secure long-term LNG supply in India’s market, with GAIL having an option to extend the 14-year agreement by another two years.
ConocoPhillips Looks to Scale Portfolio, But Citgo Auction Not a Factor
2024-05-15 - ConocoPhillips has a long-term ambition to boost its LNG offtake capacity to between 10 mtpa to 15 mtpa as it keeps a short-term eye on the auction of Citgo Petroleum.
Linde Doubles Production Capacity at Gulf Coast Facility
2024-05-14 - Linde’s expansion of the production capacity at its air separation facility in La Porte, Texas, will help meet growing demand for industrial gases in the area.
Gas Prices in a Summer of Discontent
2024-05-14 - In February, natural gas prices dropped below $2/MMBtu and stayed there. How is the market handling it, and when will the price pick back up?